Norpac completed rockfall slope mesh installation on the rock slopes adjacent to the Bridge River 2 spare transformer. 544 m2 of Tecco G65/3 mesh was installed in accordance with the BC Ministry of Transportation (BC MoTI) specifications, including drilling and installation of mesh anchors.