BR1 Surge Towers Slope Stabilization
BR1 Surge Towers Slope Stabilization
Project summary | |
---|---|
Project | BR1 Surge Towers Slope Stabilization |
Location | Shalalth, BC |
Client Name | Tsal’alh Development LP (TDLP) / BC Hydro |
Start Date – End Date | June 2021 to June 2022 |
Contract Value | $681,924 |
Norpac completed the BR1 Surge Towers Slope Stabilization Project for BC Hydro in partnership with the Tsal’alh Development LP (TDLP). The scope of work included the following:
- 314 linear metres of foundation anchors
- 228 linear metres of shotcrete anchors
- 108 weep pipes
- 24 linear metres of rock anchors
- 1040 m2 of fibre-reinforced dry mix shotcrete
The site presented multiple challenges, including a wide range of temperature and weather conditions and remote location. A combination of rope access techniques and telehandler with man basket were used to access the rock slope.