2046 Robson Place, Erosion Control

2046 Robson Place, Erosion Control

Project summary
Project2046 Robson Place, Erosion Control
LocationKamloops, B.C.
Start DateJuly 26, 2016
Finish DateJuly 29, 2016

Install gabion slope mesh over low angle slope to prevent further slope erosion caused by water diversion. Re-establish pathway and install timber retaining wall to hold back gravel pathway.